|
Be responsible for the drawing of the complete set of system equipment and PLC program control, auditing, checking and
keeping the electrical engineering drawings, engineering drawings, auditing the electric power construction scheme,
checking whether the specifications, brands, technical performance, etc. of the data in the construction process are
consistent with the drawings, promptly handling the general quality problems and reporting them to the leaders,
supervising and inspecting the electric power construction on the construction site, and installing and debugging the
electrical equipment on the site, Analyze and deal with on-site faults: formulate various rules and regulations for
electrical equipment and measuring instruments, as well as operation SP, maintenance plan and periodic inspection plan,
and coordinate daily maintenance, maintenance and measurement inspection;
|
apply for the position
|
- Familiar with export business operation process, excellent written English, good oral English, and able to communicate
with customers;
- Familiar with common international communication etiquette; Be familiar with daily communication English, and show good
self-cultivation and professional quality when receiving guests;
- Popular office files, such as Word.excel, Photoshop, Powerpoint, Outook AutoCad, etc;
- Be able to use fax machines, photocopiers and other office equipment;
- Be able to draft standard faxes and letters, independently complete the audit of letters of credit, and formulate
correct export documents according to letters of credit; You should show a good company image when you dial and answer
the phone.
|
apply for the position
|